mirror of
https://github.com/angular/angular.git
synced 2026-11-25 16:07:50 -05:00
In the TRIAGE_AND_LABELS doc, it was not clear that the merge label may be applied by the author before the PR is green (as a sort of auto-submit). After the label is applied, it is still up to the caretaker to determine that the PR is acceptable before merging. This commit adds that clarification. PR Close #28837